com.rotase/rotase·Productivity

Rotase

Employee scheduling, staffing feasibility, localized demos, schedule reports and CSV export.

Stars
—
Version
1.0.0
License
—
Review
Passed
Registry update
Oct 13, 2026

Connect

remote
Terminal
$claude mcp add --transport http rotase https://rotase.com/mcp

Headers

Nothing to configure — it works as is.

Security review

Review passed

Reviewed 41m ago.

tools
8 tools scanned
metadata
scanned

No findings.

Tools

8
  • rotase_health

    Read-only check that the Rotase scheduling service is available. Use this when connectivity or service availability is uncertain. It does not require a project and does not change data.

  • rotase_examples

    Read an example store, employees and complete project payload. Defaults to English labels; pass a supported language code to localize names. Call this when the project structure or field names are unknown. The returned project can be copied and edited before validation. This operation is read-only and does not access a user browser or saved project.

  • rotase_create_demo_project

    Create a localized demonstration project using the same project-creation operation as the Rotase API. The server chooses the current period in the requested timezone, loads the localized demo names and company name, applies the selected country calendar and can generate an initial schedule. The result is returned in the response; nothing is saved on the server or in a browser.

  • rotase_validate_project

    Validate a complete Rotase project payload without saving or modifying it. Use rotase_examples first if the payload shape is unknown. Call this before feasibility checks or schedule generation. The input is the project object itself, not a wrapper with an additional "project" property.

  • rotase_generate_schedule

    Generate a monthly employee schedule from a complete Rotase project payload. Use rotase_examples to obtain a template, then rotase_validate_project first. The operation calculates and returns a schedule; it does not save a project, modify browser storage or create an account. Explain returned violations or shortages instead of assuming that every project is schedulable.

  • rotase_check_feasibility

    Check whether a complete Rotase project can satisfy opening hours, staffing requirements, availability, rest rules and work-hour limits. Use after rotase_validate_project and before generation when the user asks whether a schedule is possible. This operation is read-only and does not save or modify the project.

  • rotase_schedule_report

    Calculate per-store and per-employee statistics for a generated monthly schedule. Pass the complete project object and either provide the generated schedule as the top-level "schedule" property or put it in the project schedules array. This operation is read-only and does not save data.

  • rotase_export_csv

    Export a generated monthly schedule as spreadsheet-compatible CSV. Pass the complete project object and either provide the generated schedule as the top-level "schedule" property or put it in the project schedules array. The response contains the CSV text; nothing is saved on the server.

More in Productivity

Listing from the official MCP Registry.